WORK DAY RESULTS for OCTOBER 13, 2013
Posted on by Paul Vann on October 13th, 2012 | 0 Comments »
We had four to show up for workday this morning and they worked hard to accomplish a lot of needed items to make the lodge proud. Below are all of the items that we got accomplished today.
-
Low hanging trees and those growing through the fence were trimmed.
-
Several broken boards were replaced in the privacy fence behind the lodge.
-
New locks and Dead bolts were installed on both doors. Old key will still work on old and these new locks.
-
New parking lot light was installed on the East end of the building.
-
New shut off valves were were put in the bathrooms for the sink and toilet.
-
New water lines were put in the bathrooms after replacing the shut off valves.
-
The sink bracket in the men’s bathroom was re-secured to the wall and it is nice and stable now.
-
The wax ring and mounting bracket in the women’s bathroom was replaced due to being broken.
-
Plug plate under the alter was replaced.
-
Plug at the Master’s Station received a weather proof safety cover.
-
New door sweep was installed on the lodge room exit door.
-
Exterior plug on East end of the building was replaced and a weather proof fixture was installed.
-
Several holes in the East end parking area were filled with dirt.
-
There are still several other items that need repair so we will be planning more work days to get these accomplished.